TAI//SWITCH · COMPUTATION TRACE
IDLE
COMPUTE LOG │ IDLE · NO RUN YET
TAI v2.0 · BUILD 11c4a7f · FREEZE 2026-05-23 · SECTOR — · RENDERED — · SOURCE INFERENCES —
TAI//SWITCH ENGINE
SESSION —
OPERATOR // REV M
WORKSPACE // ANTONYM-CORE
MODEL: TAI v2.0 · BUILD 11c4a7f
◉ NOMINAL · ALL SYSTEMS
01

Ingest / CAD Intelligence

PIPELINEPARSE → INFER → EXTRACT
TARGETSWITCH DELTA · PART-LEVEL
Drop CAD file
.STEP · .STP · .IGES · .X_T · .STL · .SLDPRT
OR PASTE PLM LINK · OR PULL FROM TEAMCENTER
Inferred from CAD awaiting geometry
—
Derived claim · basis
TYPE
—
MATERIAL
—
UNITS
—
MASS
—
VOLUME
—
SURFACE AREA
—
ENVELOPE
—
BUY-TO-FLY
—
PROCESS ROUTE
—
GEO CONFIDENCE
—
TOL CLASS
—
Model scope 8 of 8 engaged
LIFECYCLE · CRADLE-TO-GRAVE
DOWNTIME EXPOSURE MODEL
INVENTORY + WORKING CAPITAL
RESILIENCE · NODE GRAPH
CARBON + SCOPE 1+2+3
REGIONAL / STRATEGIC IMPACT
CRADLE-TO-GRAVE IMPACT MODELLING
COST-OF-INACTION ANALYSIS
Value forgone
NO OTHER PARTS ANALYSED —
CAD INTELLIGENCE PIPELINE // UNSPECIFIED PART · AWAITING CAD
ELAPSED 00:06.124 · 6 OF 6 LAYERS · 47 FEATURES · 218K MESH FACES
NO RUN
PARSE TRACE
MESH INTEGRITY
FACE COUNT—
MANIFOLD—
BOUNDARY EDGES—
NON-MANIFOLD—
WINDING—
VALIDATION
BBOX VALID—
VOLUME VALID—
MASS VALID—
SCALE CHECK—
INVARIANTS—
ENGINE
PART MASS—
INCUMBENT BTF—
INCUMBENT MACHINING—
ANNUAL VALUE—
NPV 10Y—
INPUT PROVENANCE—
PARSED GEOMETRY ISO
AWAITING CAD UPLOAD
UPLOAD A PART FILE TO ACTIVATE
AWAITING CAD UPLOAD
UPLOAD A PART FILE ABOVE TO LOAD GEOMETRY INTO THIS VIEWPORT
no alloy
AWAITING CAD UPLOAD
UPLOAD A PART FILE TO ACTIVATE
PROCESS MAP ISO
AWAITING CAD UPLOAD
UPLOAD A PART FILE TO ACTIVATE
COST DRIVERS · INFERRED6 / 47
F-03 · Pin bore Ø24 · FASTENER INTERFACEINSPECT CRITICALBore grind req'd → machine +2.1h · HIGH DIMENSIONAL CONFIDENCE REQUIRED · yield risk ↑
F-12 · Web thin wall 1.8mmFAILURE RISKDistortion risk ↑ → support +18% → post-proc step added · reject rate ↑
F-21 · 4× M10 bolt patternPROCESS CONST.5-axis hold req'd → setup +1 · pos cert ±0.1mm → CMM mandatory
F-34 · 52° overhang faceGEO-INDUCEDSupport vol +22% → removal +1.4h → surface quality risk at 52° interface
F-08 · Fillet R0.8 internalTOOLING LOCKR0.8 ball-end req'd → tool change +1 · cycle ↑ · stress conc. risk at root
F-17 · Ra 0.8 bearing surfaceOKAchievable via DMLS + light finish pass → no constraint on current process
MANUFACTURABILITYANTONYM NODE · A−
PRINTABILITY
0.92
Driven by: F-03, F-08 · geometry within envelope
FINISH REACH
0.88
Driven by: F-17 · Ra 0.8 limits deep-bore access
SUPPORT BURDEN
0.74
Driven by: F-34 (52°) + F-12 · primary drag
HEAT TREAT FIT
0.91
Driven by: F-12 wall mass delta · within spec
INSPECTION
0.84
Driven by: F-03 bore geometry + F-21 pos tol · CMM mandatory
QUAL FIT
0.93
Driven by: all features within qualification envelope
EXTRACTED COST DRIVERSINCUMBENT → ANTONYM
MATERIAL USE 19.8 kg → 3.4 kg
MACHINE HOURS 14.2h → 6.1h
SETUP COUNT 6 → 1
POST-PROCESS 4 steps → 2
QUAL ARTIFACTS per-unit → amortised
FEEDSBTF · MACHINING HRS · INSPECTION · YIELD BASISGEOMETRY TOLERANCESINFERRED
02

Value / Unlocked by Switching

PART UNSPECIFIED PART · AWAITING CAD
SWITCH OLD WAY → ANTONYM NETWORK
TAI INDEX SWITCH DECISION METRIC
— / 100
—
—
Value Unlocked by Switching to the Antonym Network
Old Way → Antonym
Distributed Network
18-WEEK OEM PIPELINE → 72-HOUR LOCAL NODE PRODUCTION · PART-LEVEL SWITCH
ANNUAL VALUE UNLOCKED
—
—
—
CASE POSITIVE ≥ 1 UNIT/YR · SWEET SPOT 5–70 UNITS/YR
LEAD TIME REDUCTION
—
126 DAYS → 3 DAYS · AT LOCAL NODE
—
LIFECYCLE CO₂ REDUCTION
—
CRADLE-GRAVE · 142 → 48 kg / PART
—
VALUE AT RISK · SERVICE LIFE
—
—
—
Cost ofInaction
DAILY LOSS
—
QUARTERLY LOSS
—
90-DAY VALUE DESTRUCTION
—
ANNUAL · AVOIDABLE
—
—
Switch Confidence
—
——
CAD + FEATURES—
MATERIAL FIT—
DOWNTIME PRIORS—
LOGISTICS COSTS—
NODE CAPACITY—
DEMAND CURVE—
—

WHY THIS PART SHOULD SWITCH

01
-
-
02
-
-
03
-
-
04
-
-

SOVEREIGNTY IMPACT · DERIVED

ECONOMIC OUTPUT
GVA Added —
GDP Contribution · Proxy —
Tax Base Retained —
LABOUR · CAPABILITY
Local Jobs Supported —
Domestic Capability Uplift —
SYSTEM · SOVEREIGNTY
Local Value Retained —
Supply Chain Localisation —
High-Skill Work Retained —
Resilience Score —
Dependency Reduction —
Working Capital Released —
—
Switching to distributed production repatriates manufacturing capability — retaining GVA, tax base, and critical-tier resilience within the domestic industrial base.

TAI INDEX · COMPONENT DECOMPOSITION

AWAITING CAD UPLOAD
03

Architecture / Old Way vs Antonym Way

MODE SUPPLY CHAIN TOPOLOGY COMPARE
SCOPE SINGLE PART · END-TO-END
SUPPLY CHAIN STEPS
—
—
TOTAL DISTANCE
—
—
COORDINATION LAYERS
—
—
LEAD TIME
—
—
—
SUPPLY CHAIN TOPOLOGY
ARCHITECTURE
OLD WAY
CENTRALISED
MEGAFACTORY
LINEAR PIPELINE · SINGLE POINT OF FAILURE · HIGH LATENCY
COORD LAYERS — → —
HANDOFFS — → —
EXEC MODE HUMAN-COORDINATED → MACHINE-ORCHESTRATED
ANTONYM WAY
DISTRIBUTED
NODE NETWORK
DISTRIBUTED EXECUTION · PARALLEL ROUTING · API-DRIVEN
TOPOLOGY INSIGHTS · DERIVED
—
—
—
—
04

Lifecycle / Cradle-to-Grave Decomposition

PHASES 4 · MFG · SUPPLY · OPS · EOL
SCOPE— VALUE POOLS MODELLED
VALUE CONCENTRATION · PHASE CONTRIBUTION TO ANNUAL DELTA GROSS —
PHASE A · BIRTH
Birth / Manufacturing
efficiency layer
——
CORE ECONOMICS
Raw material + price vol.—
Tooling + FAI amortisation—
Machine time · 14.2→6.1h—
SYSTEM BEHAVIOUR
Labor + iteration · 6→1—
Scrap + rework + disposal—
STRATEGIC IMPACT
Post-process · 4→2 steps—
QA + cert · inspection—
Qualification capex · amortised—
PRIMARY DRIVERS · TOP 3 OF PHASE
ENVIRONMENTAL
Process energy CO₂—
Material waste CO₂—
Coolant stream CO₂—
CO₂ / part (old → new)—
STRATEGIC / RESILIENCE
Manufacturing agility—
Supplier dependency—
Manufacturing flexibility—
IP leakage risk—
Local capability value—
PHASE B · MOVEMENT
Movement / Supply Chain
latency layer
——
CORE ECONOMICS
Ocean freight · 8,400 km—
Customs · duty 6.2%—
Warehousing · 6 nodes—
SYSTEM BEHAVIOUR
Inventory carrying · 12.4%—
Variance buffer · ±22d—
STRATEGIC IMPACT
Expediting · disruption events—
Transit insurance—
PRIMARY DRIVERS · TOP 3 OF PHASE
ENVIRONMENTAL
Transport emissions—
Warehouse energy CO₂—
Packaging logistics CO₂—
Port handling CO₂—
STRATEGIC / RESILIENCE
Lead-time variance · coordination—
Concentration risk · bullwhip—
Customs · currency + delay—
Disruption exposure—
Reroute option value—
PHASE C · LIFE · PRIMARY VALUE DRIVER
Life / Operations
existential risk layer
——
CORE ECONOMICS
Disruption events · old → new—
Over-maintenance overhead—
Fill rate · 72 → 99%—
SYSTEM BEHAVIOUR
Reroute · dynamic†—
Service penalties · SLA—
STRATEGIC IMPACT
Planning + shadow inventory—
Asset utilisation loss†—
PRIMARY DRIVERS · TOP 3 OF PHASE
OPERATIONAL METRICS · CRITICAL
MTBF (old → new)—
Cost / downtime event—
Disruption rate (old → new)—
Fill rate (old → new)—
Resilience score—
Latency removed—
ENVIRONMENTAL
Emergency air-freight CO₂—
Recovery logistics CO₂—
Idle asset emissions—
Overproduction inefficiency—
STRATEGIC / RESILIENCE
Operational readiness value—
Replacement latency cost—
External dependency exposure—
Local availability advantage—
Redundancy + N+1 value—
PHASE D · DEATH
Death / End-of-Life
recovery layer
——
CORE ECONOMICS
Ti scrap recovery value—
Disposal cost avoided—
Powder reclaim · recycling Δ—
SYSTEM BEHAVIOUR
Reman potential · unlocked†—
Lifecycle extension + repair†—
STRATEGIC IMPACT
Replacement cycle savings—
Reverse logisticsflat
PRIMARY DRIVERS · TOP 3 OF PHASE
ENVIRONMENTAL
Disposal emissions CO₂—
Recycling efficiency CO₂—
Circularity benefit CO₂—
STRATEGIC / RESILIENCE
Circular supply chain—
Local reuse capability—
Digital twin value—
CROSS-PHASE · INVENTORY POSITION
WC locked —
Capital released —
Days on hand (old→new) —
Turns / yr (old→new) —
Stockout risk (old→new) —
CRADLE-TO-GRAVE TOTAL · GROSS PHASE SAVINGS · BEFORE PLATFORM FEE
COST OF INACTION / DAY  $24.0K / DAY DESTROYED
A · MFG —
B · SUPPLY —
C · OPS —
D · EOL —
GROSS
—
NETWORK EFFECT APPLIED · ANTONYM MOAT MODEL
Utilisation gain —
Rerouting capability —
Network redundancy —
Nodes · regions —
Moat score —
NETWORK EFFECT · ALL POOLS (beyond NPV)
— / YR
05

Value / Switching Decomposition

HORIZON ANNUAL · NPV — @ —
SCOPE PART-LEVEL SWITCH DELTA

WATERFALL · OLD WAY TCO → ANNUAL VALUE UNLOCKED

NO RUN YET
CARRIED BY THE MODEL · NOT IN THE TOTAL ABOVE
ANNUAL VALUE UNLOCKED
—
VS OLD WAY TCO
NPV · — @ —
—
—
PAYBACK
—
ON QUAL CAPEX
CO₂ AVOIDED · YR
—
SCOPE 1+2+3

LIFECYCLE CO₂ · CRADLE-TO-GRAVE · kg/PART

OLD WAY — → ANTONYM — —
EXTRACTION · FEEDSTOCK
—
—
FEEDSTOCK PROC
—
—
MANUFACTURING
—
—
FREIGHT
—
—
OPERATIONAL LIFE
—
—
END-OF-LIFE · RECOVERY
—
—
06

Sensitivity / Commercial Drivers

MODE LIVE RESOLVE · ANNUAL VALUE UNLOCKED
ANCHOR UNSPECIFIED PART · AWAITING CAD

COMMERCIAL DRIVERS · RESOLVED POSTURE

ANNUAL DEMAND · UNITS48
1050100
DOWNTIME COST · $/HOUR$10K
$0$5K$10K
MATERIAL COST · $/KG$50
$20$60$100
FREIGHT COST · $/KG · OLD WAY$14
$4$15$30
WACC · CAPITAL COST9.4%
5%10%15%
SUPPLY FILL RATE · %72%
40%70%98%
DISRUPTION PROBABILITY · 10Y22%
0%25%50%
LEAD TIME VARIANCE · DAYS σ14
01530
QUAL CAPEX — · INVESTMENT BASIS — · SECTOR —
TORNADO · FULL-RANGE DRIVER SENSITIVITY
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—RESOLVED—
SWING
RESOLVED · ANNUAL VALUE UNLOCKED
—
P25 —  ·  P75 —  ·  10Y NPV BAND
NPV · 10Y
—
IRR · DCF
—
PAYBACK
—
BREAK-EVEN
—
COI / DAY
—
OPERATIONAL EXPOSURE · OLD-WAY POSTURE —
DOWNTIME RISK / YR——
FILL-RATE GAP PENALTY——
EMERGENCY PROCUREMENT——
INVENTORY CARRY + OBS——
CUSTOMS + BORDER DRAG——
QUAL AMORT BURDEN / YR——
—
DOMINANT DRIVER—
DOMINANCE RATIO—
VOLATILITY SURFACE—
SWING ASYMMETRY—
DRIVER PATTERN—
SCENARIO RANGE · SECTOR-CALIBRATED P25–P75
P25 · DOWNSIDE
—
—
P50 · BASE
—
CURRENT POSTURE
P75 · UPSIDE
—
—
—
SPREAD — · P25–P75 TOP DRIVERS — · —
—
STRATEGIC DEPENDENCY · SWITCH POSTURE
RESILIENCE SCORE
—
SELECT SECTOR TO ACTIVATE
DEPENDENCY RED.
—
INVENTORY + NETWORK
QUAL EXPOSURE
—
% OF ANNUAL VALUE
AVAILABILITY GAIN
—
FILL RATE DELTA
SWITCH CASE SIGNAL
—
07

Methodology / Model Stack + Sources

INPUTS —
DECLARED—

ASSUMPTION LEDGER + PROVENANCE14 INPUTS

—

MODEL STACKTAI-SWITCH v2.0

L1
CAD ingest · mesh
PARSER—
UNITS—
GEOMETRY CONF—
FIELDS DERIVED—
NOT AVAILABLEBREP TOPOLOGY · PMI · DECLARED TOLERANCES
L2
Cost driver extraction
METHODCLOSED-FORM PHYSICAL MODELS
OLD WAYSUBTRACTIVE · BILLET → MACHINED
ANTONYM WAYDMLS + FINISH
DRIVERSMACHINE TIME · MATERIAL UTILISATION · SUPPORT BURDEN · POST-PROCESS · INSPECTION
CALIBRATIONDECLARED CONSTANTS · NO TRAINED CORPUS
L3
Dual architecture
OLD WAY LEAD—
ANTONYM LEAD—
BUILT FROMROUTING · QUEUE · BUILD · POST-PROCESS · VALIDATION · DISPATCH
REDUCTION—
ALSO MODELLEDFREIGHT · CUSTOMS · WAREHOUSING · INVENTORY CARRY · DUTY
METHODCOMPUTED · NOT SIMULATED
L4
Operational exposure
METHODDETERMINISTIC CLOSED FORM
TERMSDOWNTIME · FILL-RATE GAP · EMERGENCY PROCUREMENT · INVENTORY CARRY · CUSTOMS
OUTPUTPOINT ESTIMATES · NOT DISTRIBUTIONS
RANGEP25–P75 BY FULL-RANGE DRIVER SWEEP · SECTION 06
L5
Lifecycle CO₂
GRID INTENSITY—
CARBON PRICE—
SCOPEPROCESS ENERGY · EMBODIED MATERIAL · COOLANT · FREIGHT · POWDER RECLAIM
REDUCTION—
NOT APPLIEDPER-NODE GRID LOCALISATION · SINGLE REGION ONLY
L6
Switch resolver
OUTPUTSANNUAL VALUE · NPV 10Y · IRR · PAYBACK · BREAK-EVEN
CONFIDENCE—
BUILT FROMGEOMETRY CONFIDENCE × INPUT PROVENANCE MIX
PENALTYSENSITIVITY VARIANCE · SECTION 06
METHODWEIGHTED COMPOSITE · NOT A POSTERIOR
Coefficient basis · what every term is grounded in —
—
Confidence · decomposed, weakest component first —
Disclosures · conditions this run operates under —
08

Report / Board-Ready Part Dossier

FORMAT 18-PAGE DILIGENCE MEMO
GRADE BOARD-READY · SIGNED
SWITCHING DOSSIER
TAI-SWITCH
v2.0
2026·04·10
NO RENDER
UNSPECIFIED PART
Geometry · measured
Mass—
Volume—
Surface—
Envelope—
Mesh—
Complexity—
Process · derived
Material—
Route—
Buy-to-fly—
Machine hrs—
Setup hrs—
Qualification—
Posture · supplied
Sector—
Use case—
Annual demand—
Lead time—
Disruption rate—
Inventory held—
Executive Summary · excerpt from page 1

Upload a CAD file to generate the executive summary for your part.

Headline Metrics
ANNUAL VALUE
—
LEAD TIME
—
DOWNTIME AVOIDED
—
LIFECYCLE CO₂
—
Report Contents · —
Cost of Inaction · Legacy Leak Rate
COST OF INACTION
PER DAY
—
PER QUARTER
—
VALUE DESTROYED · 90 DAYS
—
Sunk Cost Treatment · Accounting Transparency
Historical Sunk Cost—Excluded from NPV — past, unrecoverable
Trapped Capital (Recoverable)—Enters switch NPV — released day 1
Legacy Continuation Cost—Included in COI — ongoing annual drain
Switching Friction Cost—One-time transition cost — amortised in NPV
TAI-SWITCH // SESSION 2026.04.10.1422Z · UNSPECIFIED PART · AWAITING CAD HASH 7f3c…9e11 · SIGNED
INTERNAL JUSTIFICATION KIT
GENERATE DOSSIER→
EXPORT · EXEC SUMMARY (PDF)↓
EXPORT · BOARD DECK (PPTX)↓
EXPORT · LIFECYCLE MODEL (XLSX)↓
EXPORT · SOURCE APPENDIX ONLY↓
TRANSMIT TO PROCUREMENT + CFO→
REPORT PROPERTIES
PAGES—
SECTIONS—
NAMED REFERENCES—
PUBLISHED FORMULAE—
CONFIDENCE—
COMPUTED—
INPUT + RESULT DIGEST—
AUDIT LOG