TAI//SWITCH · COMPUTATION TRACE
IDLE
COMPUTE LOG IDLE · NO RUN YET
TAI v2.0 · BUILD 11c4a7f · FREEZE 2026-05-23 · SECTOR — · RENDERED — · SOURCE INFERENCES —
TAI//SWITCH ENGINE
SESSION —
OPERATOR // REV M
WORKSPACE // ANTONYM-CORE
MODEL: TAI v2.0 · BUILD 11c4a7f
NOMINAL · ALL SYSTEMS
01

Ingest / CAD Intelligence

PIPELINEPARSE → INFER → EXTRACT
TARGETSWITCH DELTA · PART-LEVEL
Drop CAD file
.STEP · .STP · .IGES · .X_T · .STL · .SLDPRT
OR PASTE PLM LINK · OR PULL FROM TEAMCENTER
Inferred from CAD awaiting geometry
Derived claim · basis
TYPE
MATERIAL
UNITS
MASS
VOLUME
SURFACE AREA
ENVELOPE
BUY-TO-FLY
PROCESS ROUTE
GEO CONFIDENCE
TOL CLASS
Model scope 8 of 8 engaged
LIFECYCLE · CRADLE-TO-GRAVE
DOWNTIME EXPOSURE MODEL
INVENTORY + WORKING CAPITAL
RESILIENCE · NODE GRAPH
CARBON + SCOPE 1+2+3
REGIONAL / STRATEGIC IMPACT
CRADLE-TO-GRAVE IMPACT MODELLING
COST-OF-INACTION ANALYSIS
Value forgone
NO OTHER PARTS ANALYSED
CAD INTELLIGENCE PIPELINE // UNSPECIFIED PART · AWAITING CAD
ELAPSED 00:06.124 · 6 OF 6 LAYERS · 47 FEATURES · 218K MESH FACES
NO RUN
PARSE TRACE
MESH INTEGRITY
FACE COUNT
MANIFOLD
BOUNDARY EDGES
NON-MANIFOLD
WINDING
VALIDATION
BBOX VALID
VOLUME VALID
MASS VALID
SCALE CHECK
INVARIANTS
ENGINE
PART MASS
INCUMBENT BTF
INCUMBENT MACHINING
ANNUAL VALUE
NPV 10Y
INPUT PROVENANCE
PARSED GEOMETRY ISO
AWAITING CAD UPLOAD
UPLOAD A PART FILE TO ACTIVATE
AWAITING CAD UPLOAD
UPLOAD A PART FILE ABOVE TO LOAD GEOMETRY INTO THIS VIEWPORT
no alloy
AWAITING CAD UPLOAD
UPLOAD A PART FILE TO ACTIVATE
PROCESS MAP ISO
AWAITING CAD UPLOAD
UPLOAD A PART FILE TO ACTIVATE
COST DRIVERS · INFERRED6 / 47
F-03 · Pin bore Ø24 · FASTENER INTERFACEINSPECT CRITICALBore grind req'd → machine +2.1h · HIGH DIMENSIONAL CONFIDENCE REQUIRED · yield risk ↑
F-12 · Web thin wall 1.8mmFAILURE RISKDistortion risk ↑ → support +18% → post-proc step added · reject rate ↑
F-21 · 4× M10 bolt patternPROCESS CONST.5-axis hold req'd → setup +1 · pos cert ±0.1mm → CMM mandatory
F-34 · 52° overhang faceGEO-INDUCEDSupport vol +22% → removal +1.4h → surface quality risk at 52° interface
F-08 · Fillet R0.8 internalTOOLING LOCKR0.8 ball-end req'd → tool change +1 · cycle ↑ · stress conc. risk at root
F-17 · Ra 0.8 bearing surfaceOKAchievable via DMLS + light finish pass → no constraint on current process
MANUFACTURABILITYANTONYM NODE · A−
PRINTABILITY
0.92
Driven by: F-03, F-08 · geometry within envelope
FINISH REACH
0.88
Driven by: F-17 · Ra 0.8 limits deep-bore access
SUPPORT BURDEN
0.74
Driven by: F-34 (52°) + F-12 · primary drag
HEAT TREAT FIT
0.91
Driven by: F-12 wall mass delta · within spec
INSPECTION
0.84
Driven by: F-03 bore geometry + F-21 pos tol · CMM mandatory
QUAL FIT
0.93
Driven by: all features within qualification envelope
EXTRACTED COST DRIVERSINCUMBENT → ANTONYM
MATERIAL USE 19.8 kg → 3.4 kg
MACHINE HOURS 14.2h → 6.1h
SETUP COUNT 6 → 1
POST-PROCESS 4 steps → 2
QUAL ARTIFACTS per-unit → amortised
FEEDSBTF · MACHINING HRS · INSPECTION · YIELD BASISGEOMETRY TOLERANCESINFERRED
02

Value / Unlocked by Switching

PART UNSPECIFIED PART · AWAITING CAD
SWITCH OLD WAY → ANTONYM NETWORK
TAI INDEX SWITCH DECISION METRIC
/ 100
Value Unlocked by Switching to the Antonym Network
Old Way → Antonym
Distributed Network
18-WEEK OEM PIPELINE → 72-HOUR LOCAL NODE PRODUCTION · PART-LEVEL SWITCH
ANNUAL VALUE UNLOCKED
CASE POSITIVE ≥ 1 UNIT/YR · SWEET SPOT 5–70 UNITS/YR
LEAD TIME REDUCTION
126 DAYS → 3 DAYS · AT LOCAL NODE
LIFECYCLE CO₂ REDUCTION
CRADLE-GRAVE · 142 → 48 kg / PART
VALUE AT RISK · SERVICE LIFE
Cost ofInaction
DAILY LOSS
QUARTERLY LOSS
90-DAY VALUE DESTRUCTION
ANNUAL · AVOIDABLE
Switch Confidence
CAD + FEATURES
MATERIAL FIT
DOWNTIME PRIORS
LOGISTICS COSTS
NODE CAPACITY
DEMAND CURVE

WHY THIS PART SHOULD SWITCH

01
-
-
02
-
-
03
-
-
04
-
-

SOVEREIGNTY IMPACT · DERIVED

ECONOMIC OUTPUT
GVA Added
GDP Contribution · Proxy
Tax Base Retained
LABOUR · CAPABILITY
Local Jobs Supported
Domestic Capability Uplift
SYSTEM · SOVEREIGNTY
Local Value Retained
Supply Chain Localisation
High-Skill Work Retained
Resilience Score
Dependency Reduction
Working Capital Released
Switching to distributed production repatriates manufacturing capability — retaining GVA, tax base, and critical-tier resilience within the domestic industrial base.

TAI INDEX · COMPONENT DECOMPOSITION

AWAITING CAD UPLOAD
03

Architecture / Old Way vs Antonym Way

MODE SUPPLY CHAIN TOPOLOGY COMPARE
SCOPE SINGLE PART · END-TO-END
SUPPLY CHAIN STEPS
TOTAL DISTANCE
COORDINATION LAYERS
LEAD TIME
SUPPLY CHAIN TOPOLOGY
ARCHITECTURE
OLD WAY
CENTRALISED
MEGAFACTORY
LINEAR PIPELINE · SINGLE POINT OF FAILURE · HIGH LATENCY
COORD LAYERS  → 
HANDOFFS  → 
EXEC MODE HUMAN-COORDINATED → MACHINE-ORCHESTRATED
ANTONYM WAY
DISTRIBUTED
NODE NETWORK
DISTRIBUTED EXECUTION · PARALLEL ROUTING · API-DRIVEN
TOPOLOGY INSIGHTS · DERIVED
04

Lifecycle / Cradle-to-Grave Decomposition

PHASES 4 · MFG · SUPPLY · OPS · EOL
SCOPE VALUE POOLS MODELLED
VALUE CONCENTRATION · PHASE CONTRIBUTION TO ANNUAL DELTA GROSS
PHASE A · BIRTH
Birth / Manufacturing
efficiency layer
CORE ECONOMICS
Raw material + price vol.
Tooling + FAI amortisation
Machine time · 14.2→6.1h
SYSTEM BEHAVIOUR
Labor + iteration · 6→1
Scrap + rework + disposal
STRATEGIC IMPACT
Post-process · 4→2 steps
QA + cert · inspection
Qualification capex · amortised
PRIMARY DRIVERS · TOP 3 OF PHASE
ENVIRONMENTAL
Process energy CO₂
Material waste CO₂
Coolant stream CO₂
CO₂ / part (old → new)
STRATEGIC / RESILIENCE
Manufacturing agility
Supplier dependency
Manufacturing flexibility
IP leakage risk
Local capability value
PHASE B · MOVEMENT
Movement / Supply Chain
latency layer
CORE ECONOMICS
Ocean freight · 8,400 km
Customs · duty 6.2%
Warehousing · 6 nodes
SYSTEM BEHAVIOUR
Inventory carrying · 12.4%
Variance buffer · ±22d
STRATEGIC IMPACT
Expediting · disruption events
Transit insurance
PRIMARY DRIVERS · TOP 3 OF PHASE
ENVIRONMENTAL
Transport emissions
Warehouse energy CO₂
Packaging logistics CO₂
Port handling CO₂
STRATEGIC / RESILIENCE
Lead-time variance · coordination
Concentration risk · bullwhip
Customs · currency + delay
Disruption exposure
Reroute option value
PHASE C · LIFE · PRIMARY VALUE DRIVER
Life / Operations
existential risk layer
CORE ECONOMICS
Disruption events · old → new
Over-maintenance overhead
Fill rate · 72 → 99%
SYSTEM BEHAVIOUR
Reroute · dynamic
Service penalties · SLA
STRATEGIC IMPACT
Planning + shadow inventory
Asset utilisation loss
PRIMARY DRIVERS · TOP 3 OF PHASE
OPERATIONAL METRICS · CRITICAL
MTBF (old → new)
Cost / downtime event
Disruption rate (old → new)
Fill rate (old → new)
Resilience score
Latency removed
ENVIRONMENTAL
Emergency air-freight CO₂
Recovery logistics CO₂
Idle asset emissions
Overproduction inefficiency
STRATEGIC / RESILIENCE
Operational readiness value
Replacement latency cost
External dependency exposure
Local availability advantage
Redundancy + N+1 value
PHASE D · DEATH
Death / End-of-Life
recovery layer
CORE ECONOMICS
Ti scrap recovery value
Disposal cost avoided
Powder reclaim · recycling Δ
SYSTEM BEHAVIOUR
Reman potential · unlocked
Lifecycle extension + repair
STRATEGIC IMPACT
Replacement cycle savings
Reverse logisticsflat
PRIMARY DRIVERS · TOP 3 OF PHASE
ENVIRONMENTAL
Disposal emissions CO₂
Recycling efficiency CO₂
Circularity benefit CO₂
STRATEGIC / RESILIENCE
Circular supply chain
Local reuse capability
Digital twin value
CROSS-PHASE · INVENTORY POSITION
WC locked 
Capital released 
Days on hand (old→new) 
Turns / yr (old→new) 
Stockout risk (old→new) 
CRADLE-TO-GRAVE TOTAL · GROSS PHASE SAVINGS · BEFORE PLATFORM FEE
COST OF INACTION / DAY  $24.0K / DAY DESTROYED
A · MFG
B · SUPPLY
C · OPS
D · EOL
GROSS
NETWORK EFFECT APPLIED · ANTONYM MOAT MODEL
Utilisation gain 
Rerouting capability 
Network redundancy 
Nodes · regions 
Moat score 
NETWORK EFFECT · ALL POOLS (beyond NPV)
/ YR
05

Value / Switching Decomposition

HORIZON ANNUAL · NPV @
SCOPE PART-LEVEL SWITCH DELTA

WATERFALL · OLD WAY TCO → ANNUAL VALUE UNLOCKED

NO RUN YET
CARRIED BY THE MODEL · NOT IN THE TOTAL ABOVE
ANNUAL VALUE UNLOCKED
VS OLD WAY TCO
NPV · @
PAYBACK
ON QUAL CAPEX
CO₂ AVOIDED · YR
SCOPE 1+2+3

LIFECYCLE CO₂ · CRADLE-TO-GRAVE · kg/PART

OLD WAY ANTONYM
EXTRACTION · FEEDSTOCK
FEEDSTOCK PROC
MANUFACTURING
FREIGHT
OPERATIONAL LIFE
END-OF-LIFE · RECOVERY
06

Sensitivity / Commercial Drivers

MODE LIVE RESOLVE · ANNUAL VALUE UNLOCKED
ANCHOR UNSPECIFIED PART · AWAITING CAD

COMMERCIAL DRIVERS · RESOLVED POSTURE

ANNUAL DEMAND · UNITS48
1050100
DOWNTIME COST · $/HOUR$10K
$0$5K$10K
MATERIAL COST · $/KG$50
$20$60$100
FREIGHT COST · $/KG · OLD WAY$14
$4$15$30
WACC · CAPITAL COST9.4%
5%10%15%
SUPPLY FILL RATE · %72%
40%70%98%
DISRUPTION PROBABILITY · 10Y22%
0%25%50%
LEAD TIME VARIANCE · DAYS σ14
01530
QUAL CAPEX · INVESTMENT BASIS · SECTOR
TORNADO · FULL-RANGE DRIVER SENSITIVITY
RESOLVED
SWING
RESOLVED · ANNUAL VALUE UNLOCKED
P25 —  ·  P75 —  ·  10Y NPV BAND
NPV · 10Y
IRR · DCF
PAYBACK
BREAK-EVEN
COI / DAY
OPERATIONAL EXPOSURE · OLD-WAY POSTURE
DOWNTIME RISK / YR
FILL-RATE GAP PENALTY
EMERGENCY PROCUREMENT
INVENTORY CARRY + OBS
CUSTOMS + BORDER DRAG
QUAL AMORT BURDEN / YR
DOMINANT DRIVER
DOMINANCE RATIO
VOLATILITY SURFACE
SWING ASYMMETRY
DRIVER PATTERN
SCENARIO RANGE · SECTOR-CALIBRATED P25–P75
P25 · DOWNSIDE
P50 · BASE
CURRENT POSTURE
P75 · UPSIDE
SPREAD  · P25–P75 TOP DRIVERS  · 
STRATEGIC DEPENDENCY · SWITCH POSTURE
RESILIENCE SCORE
SELECT SECTOR TO ACTIVATE
DEPENDENCY RED.
INVENTORY + NETWORK
QUAL EXPOSURE
% OF ANNUAL VALUE
AVAILABILITY GAIN
FILL RATE DELTA
SWITCH CASE SIGNAL
07

Methodology / Model Stack + Sources

INPUTS
DECLARED

ASSUMPTION LEDGER + PROVENANCE14 INPUTS

MODEL STACKTAI-SWITCH v2.0

L1
CAD ingest · mesh
PARSER
UNITS
GEOMETRY CONF
FIELDS DERIVED
NOT AVAILABLEBREP TOPOLOGY · PMI · DECLARED TOLERANCES
L2
Cost driver extraction
METHODCLOSED-FORM PHYSICAL MODELS
OLD WAYSUBTRACTIVE · BILLET → MACHINED
ANTONYM WAYDMLS + FINISH
DRIVERSMACHINE TIME · MATERIAL UTILISATION · SUPPORT BURDEN · POST-PROCESS · INSPECTION
CALIBRATIONDECLARED CONSTANTS · NO TRAINED CORPUS
L3
Dual architecture
OLD WAY LEAD
ANTONYM LEAD
BUILT FROMROUTING · QUEUE · BUILD · POST-PROCESS · VALIDATION · DISPATCH
REDUCTION
ALSO MODELLEDFREIGHT · CUSTOMS · WAREHOUSING · INVENTORY CARRY · DUTY
METHODCOMPUTED · NOT SIMULATED
L4
Operational exposure
METHODDETERMINISTIC CLOSED FORM
TERMSDOWNTIME · FILL-RATE GAP · EMERGENCY PROCUREMENT · INVENTORY CARRY · CUSTOMS
OUTPUTPOINT ESTIMATES · NOT DISTRIBUTIONS
RANGEP25–P75 BY FULL-RANGE DRIVER SWEEP · SECTION 06
L5
Lifecycle CO₂
GRID INTENSITY
CARBON PRICE
SCOPEPROCESS ENERGY · EMBODIED MATERIAL · COOLANT · FREIGHT · POWDER RECLAIM
REDUCTION
NOT APPLIEDPER-NODE GRID LOCALISATION · SINGLE REGION ONLY
L6
Switch resolver
OUTPUTSANNUAL VALUE · NPV 10Y · IRR · PAYBACK · BREAK-EVEN
CONFIDENCE
BUILT FROMGEOMETRY CONFIDENCE × INPUT PROVENANCE MIX
PENALTYSENSITIVITY VARIANCE · SECTION 06
METHODWEIGHTED COMPOSITE · NOT A POSTERIOR
Coefficient basis · what every term is grounded in
Confidence · decomposed, weakest component first
Disclosures · conditions this run operates under
08

Report / Board-Ready Part Dossier

FORMAT 18-PAGE DILIGENCE MEMO
GRADE BOARD-READY · SIGNED
SWITCHING DOSSIER
TAI-SWITCH
v2.0
2026·04·10
NO RENDER
UNSPECIFIED PART
Geometry · measured
Mass
Volume
Surface
Envelope
Mesh
Complexity
Process · derived
Material
Route
Buy-to-fly
Machine hrs
Setup hrs
Qualification
Posture · supplied
Sector
Use case
Annual demand
Lead time
Disruption rate
Inventory held
Executive Summary · excerpt from page 1

Upload a CAD file to generate the executive summary for your part.

Headline Metrics
ANNUAL VALUE
LEAD TIME
DOWNTIME AVOIDED
LIFECYCLE CO₂
Report Contents ·
Cost of Inaction · Legacy Leak Rate
COST OF INACTION
PER DAY
PER QUARTER
VALUE DESTROYED · 90 DAYS
Sunk Cost Treatment · Accounting Transparency
Historical Sunk CostExcluded from NPV — past, unrecoverable
Trapped Capital (Recoverable)Enters switch NPV — released day 1
Legacy Continuation CostIncluded in COI — ongoing annual drain
Switching Friction CostOne-time transition cost — amortised in NPV
TAI-SWITCH // SESSION 2026.04.10.1422Z · UNSPECIFIED PART · AWAITING CAD HASH 7f3c…9e11 · SIGNED
INTERNAL JUSTIFICATION KIT
GENERATE DOSSIER
EXPORT · EXEC SUMMARY (PDF)
EXPORT · BOARD DECK (PPTX)
EXPORT · LIFECYCLE MODEL (XLSX)
EXPORT · SOURCE APPENDIX ONLY
TRANSMIT TO PROCUREMENT + CFO
REPORT PROPERTIES
PAGES
SECTIONS
NAMED REFERENCES
PUBLISHED FORMULAE
CONFIDENCE
COMPUTED
INPUT + RESULT DIGEST
AUDIT LOG